01
Verandas and decking
Somewhere to sit outside in a country where it rains. A deck built on a substructure that breathes, and a roof over it if you want to use it in October as well as July.
in short
AltHome builds decks and verandas across Kerry, Cork and Limerick on a substructure that breathes: joists kept clear of the ground, posts in galvanised shoes, and stainless or coated fixings near the sea. Boards are timber or composite, and a veranda roof lets you use it in October. A typical job takes one to two weeks, priced after a free survey.
what it costs
Why one deck lasts twenty years and the next one is soft in five
What you walk on is the cheap half of the decision. What holds it up decides how long it lasts. The substructure needs air under it and a way for water to leave, so joists sit clear of the ground on pads or posts, never buried in soil, and never sealed against the house wall where they would bridge the damp course. Posts go into galvanised shoes set in concrete, not into the concrete themselves, because a post cast into the ground is a post rotting from the middle out. Joist spacing follows the board, not habit: composite boards sag at spacings that softwood would take without complaint. Everything gets stainless or properly coated fixings, and within sight of the sea in Kerry or west Cork that is not a luxury, it is the only thing that stops rust streaks appearing down a new deck by the second winter. Then the board itself. Pressure treated softwood is the cheapest, takes a stain, and wants cleaning and recoating every couple of years. Hardwood is dense, dark and beautiful, expensive, and goes silver unless you oil it. Composite costs more up front, never gets painted, and does not splinter, which is what sells it to people with small children and dogs. None of them is slip proof in an Irish winter. Algae is what makes a deck slippery, not the material, so a shaded deck under trees will need washing whatever you spend. Give it a slight fall away from the house, leave gaps that actually drain, and keep the leaves off it. Last, think about the roof before the deck is built, not after. A veranda roof needs posts standing on the substructure, which means those posts have to be designed in from the start and the deck built around them.
Open deck, or covered veranda?
An open deck is used on maybe thirty good days a year here. A roofed veranda with a glass or solid roof, gutters and a light is used most of the year, and it keeps the rain off the back door and the kitchen window. It costs more, it needs its own drainage, and if it is large or high it can need planning permission, which we check at the survey. Most people who have had both say the roof is the part they would not give up.
the work
What is included in a deck or veranda?
- Set the levels off the door threshold so you step out, not down, and the damp course stays clear.
- Clear the ground, lay membrane and stone, and set pads or posts in shoes.
- Build the substructure with treated joists at the spacing the board needs, with a fall for water.
- Lay the boards with stainless fixings or hidden clips, and trim the edges properly.
- Build steps, balustrade and handrail where the drop needs one.
- Frame and roof the veranda, hang the gutter, fit the lights, and take the waste with us.
4 steps
How long does it take to build a deck or veranda?
You get in touch
Ring, message or send the form with a photo of the back of the house. We answer the same day.
We come and look
Levels, ground, drainage and where the sun actually falls, then a written price that does not move once work starts.
We build it
Substructure first, boards second, roof last. The back door stays usable and the garden takes the mess.
You sign it off
We walk it with you, tell you how to keep it clean, clear the site and leave the guarantee in writing.
next door
The rest of the back garden
A deck usually arrives as part of a bigger plan for the back of the house. These are the jobs that go with it.
asked
Verandas and decking: common questions
Timber or composite?
Timber if you like the look and do not mind washing and oiling it. Composite if you want to do nothing to it for twenty years. Composite costs more on day one and less over its life, and it does not splinter, which is what decides it for families with small children.
Will it be slippery?
Any outdoor surface gets slippery when algae grows on it. Sun and air keep a deck safe. Deep shade, overhanging trees and no drainage make one dangerous. We site it and drain it with that in mind, and a wash once or twice a year does the rest.
Do I need permission for a veranda roof?
A modest deck at ground level is not usually an issue. A roofed veranda can be, depending on its size, its height and how much garden is left. We check it at the survey and tell you before anything is ordered rather than after it is built.
How much does decking cost to build?
The area, the height off the ground, timber or composite boards, steps and balustrades, and a roof if you want one set the price. Composite costs more to buy and less to keep. We give a written price after measuring.
How long does timber decking last in Ireland?
Treated softwood lasts around 10 to 15 years with regular oiling, hardwood and good composite longer. The substructure decides most of it: a deck with air under it and proper drainage outlasts one built low on wet ground.
quote
Get a fixed quote for a deck or veranda
Tell us the address and roughly the size you want. We work across Kerry, Cork and Limerick. We ring you back within one working day. Add photos and the price we send you will be tighter.
085 220 1422 · info@althome.ie
Written by the AltHome crew. Last reviewed September 2026.
