01
Concrete work
Driveways, patios, yards, shed bases and floors. Most of the work happens before the lorry arrives, which is exactly why some slabs are still flat in twenty years and others crack in the first winter.
in short
AltHome lays concrete driveways, patios, yards, shed bases and floors across Kerry, Cork and Limerick. Most of the work is below the surface: soft ground dug out, a compacted stone subbase, the right thickness and mesh for the load, and falls so water runs away. A typical job takes two to five days, and a driveway can take a car after seven days.
why slabs crack
You are paying for what is under it, not for the concrete
Concrete is strong in compression and weak in tension, which is a technical way of saying it will carry a lorry and will crack if the ground under it moves. So the dig is the job. Topsoil and anything soft comes out until we are on firm ground, then a stone subbase goes in and is compacted in layers rather than dumped in one go. Skimp there and no amount of thickness above will save it. Thickness comes next and depends on the load. A patio or a path lives happily at around a hundred millimetres. A driveway with a car on it wants more, and a yard that takes a delivery lorry or a tractor wants more again, with steel mesh in it and a stronger mix. Fibres in the mix control the fine shrinkage cracking that happens in the first days. Mesh, correctly placed in the upper part of the slab rather than lying on the ground where it does nothing, is what holds the slab together once it does crack. Because it will crack somewhere, and that is the point of joints. We saw or form control joints in panels so the slab cracks along a straight line you cannot see instead of a jagged one across the middle. The last two are drainage and curing. Every surface gets a fall away from the house, never towards it, with a channel drain across a garage door or where the driveway meets the house. Where the ground is heavy or the site is tight, water has to go somewhere legal, so we plan a soakaway or a connection rather than sending it into the neighbour’s garden. Curing is the free part that people skip. Fresh concrete needs to be kept damp and covered for several days, and pouring in frost or in blazing sun without protection is how a surface ends up dusty and weak. We do not pour in a hard frost. We will say so and come back, which is cheaper than doing it twice.
Concrete, or paving?
Concrete is cheaper per square metre, faster to lay and has no weeds and no sunken blocks in five years. Paving is easier to lift and put back when a service has to be dug up, and it drains between the joints, which can matter where surface water has nowhere to go. Finishes make up a lot of the difference. Brushed, power floated, exposed aggregate and imprinted all start as the same pour, and the last two cost more because of the work done in the hours after it lands.
the work
What is included in concrete work?
- Set levels and falls, and check where the water is meant to end up.
- Dig out to firm ground and take the spoil away.
- Lay and compact the stone subbase in layers, and form the edges and shuttering.
- Fit membrane, mesh and any ducting for cables or a future charger before the pour.
- Pour, level and finish: brushed, floated, exposed or imprinted as agreed.
- Cut the joints, cover and cure it, fit the drains, and take the waste with us.
4 steps
How long does it take to lay a concrete driveway or slab?
You get in touch
Ring, message or send the form with a photo and rough measurements. We answer the same day.
We come and look
Ground, levels, access for the lorry and where the water goes, then a written price that does not move once work starts.
We do the work
Dig and base one day, pour the next. You will be without the driveway for about a week, and we tell you exactly which days.
You sign it off
We walk it with you once it has cured, clear the site and leave the guarantee in writing.
next door
Do it while the ground is open
Digging twice costs twice. If any of these are on your list for the next few years, say so before we pour.
asked
Concrete work: common questions
How long before I can drive on it?
Walk on it the next day, park a car on it after about a week, and keep anything heavy off it for a month. Concrete keeps gaining strength for weeks after it looks finished, and the first week is when damage is permanent.
Will it crack?
Somewhere, yes, and that is normal and designed for. Joints decide where. A slab with a compacted base, the right thickness, reinforcement and cut joints cracks along the joints, which you will not notice. A slab poured on soft ground with none of that cracks wherever it likes.
Do I need permission to concrete the front garden?
Sometimes, because rules on hard surfaces and where their water drains do apply, and they vary by council. We check it at the survey, and either way we design the fall and the drainage so the water is dealt with on your own ground.
How much does a concrete driveway cost in Ireland?
The price follows the area, how much digging and stone the ground needs, the thickness and reinforcement for the load, the finish (brushed, power floated or patterned) and the drainage. We measure on site and give a fixed written price.
How thick should a concrete driveway be?
Around 100 mm suits paths and patios. A driveway for cars wants more, and a yard that takes lorries or tractors wants more again with steel mesh and a stronger mix. The subbase under it matters as much as the slab.
quote
Get a fixed quote for concrete work
Tell us the address and roughly the area in square metres. We work across Kerry, Cork and Limerick. We ring you back within one working day. Add photos and the price we send you will be tighter.
085 220 1422 · info@althome.ie
Written by the AltHome crew. Last reviewed September 2026.