Timber frame construction
A frame goes up in days and closes in weeks instead of months. What you gain in speed you pay for in decisions made early, because a frame is designed before it is delivered.

in short
AltHome erects timber frame houses and extensions across Kerry, Cork and Limerick. The frame is made in a factory from the engineer's drawings, stood on your slab in three to six days and closed in within weeks, which takes the Irish weather out of much of the build. Lead time from order to delivery is typically 6 to 10 weeks, priced off the drawings.
frame or block
The honest difference between a frame and a block build
Start with what actually changes. The foundation, the drains, the slab, the roof covering, the windows, the plumbing, the kitchen and the driveway are the same either way. What changes is the wall that holds the house up and the order in which the weeks are spent. A frame is cut in a factory from the engineer’s drawings, delivered on a lorry and stood on your slab in under a week. The roof goes on top of it immediately, so the house is closed in while a block build would still be at first floor level. That matters most for two reasons. It takes the Irish weather out of a big chunk of the programme, and it brings your finishing trades forward, which is real money if you are paying rent or interest while you build. It also means the building dries out faster, because there is no wet plaster on the outer walls and no mortar holding water. The trade off is that a frame gives you far less room to change your mind. Every window opening, every internal wall that carries load, every stair opening and every steel is fixed when the frame is ordered. Moving a window after delivery is a carpentry job on a structural panel, not a case of leaving out three blocks. Second trade off, and people rarely hear this one until they are living in the house: a frame wall is light, so you cannot hang a heavy mirror or a wall mounted television wherever you fancy. Noggins go in where you tell us before the boards are fitted, so we ask for the television, the shelves and the bathroom fittings on a plan at first fix. On heat and comfort there is no simple winner. A frame heats up quickly and is well suited to a heat pump running steadily. A heavy block house holds heat longer. Both meet the current energy standard because both are designed to.
What is actually in the wall
From the outside in: a brick, block or rendered outer skin, a ventilated cavity, a breather membrane, the studs with insulation between them, an airtightness membrane taped at every joint, then a service cavity for cables and pipes, then the plasterboard. That service cavity is the detail worth paying for. It means no electrician ever cuts through the airtightness layer, which is where badly built frame houses leak heat and let in draughts.
the work
What is included in a timber frame build?
- Check the drawings with the frame supplier and lock the openings before anything is cut.
- Pour a slab that is level and square, because a frame will not forgive either.
- Erect the frame, brace it, and fit the roof structure straight on top of it.
- Felt, batten and tile, then fit windows and doors to close the house in.
- Build the outer skin or fix the render carrier, then tape the airtightness layer and test it.
- Form the service cavity, add noggins where you want weight hung, then board and skim.
4 steps
How long does it take to erect a timber frame house?
You get in touch
Send the drawings, or just the site address and what you are planning. We answer the same day.
We price the shell
Frame, erection, roof and closing in, in one written quote, so you are not chasing three suppliers to compare two numbers.
We build it
Slab, frame, roof, windows. The house goes from open ground to closed in inside a few weeks, weather permitting.
You sign it off
Airtightness tested, paperwork handed over, site cleared, guarantee in writing.
next door
What comes after the frame
A closed in shell is half a house. These are the trades that follow it in, usually within the same month.
asked
Timber frame construction: common questions
Is a timber frame house cheaper than block?
Not by much on the final invoice, and anyone promising a big saving is quietly comparing two different specifications. Where a frame usually wins is time. Closing in earlier shortens the programme, cuts weather risk and gets you out of rent or bridging finance sooner, and that is where the saving shows up.
Will a frame house feel flimsy or sound hollow?
A well built one does not. The floors are the giveaway: deep engineered joists, proper strutting and a good floor deck stop the bounce people remember from cheap frame houses. Internal walls can be insulated for sound, and we do that by default on bedroom and bathroom walls.
How long does a frame last?
As long as a block house, as long as it stays dry. Timber only fails where water reaches it, which is why the breather membrane, the cavity and the flashings matter more here than anywhere else. That detailing is the part of the job we do not rush.
How long does a timber frame house last?
A well built timber frame kept dry lasts for generations, as a block house does. The frame is protected by the breather membrane, cladding and roof, so the detailing at the windows and base is what matters.
Can a timber frame house get a good BER rating?
Yes. Timber frame walls are easy to insulate to a high standard and to make airtight, so frame houses readily meet current A rated energy requirements when the airtightness layer is taped and tested.
quote
Get a fixed quote for a timber frame
Tell us the address and what you want built. We work across Kerry, Cork and Limerick. We ring you back within one working day. Send the drawings and the price we send you will be tighter.