Tarmac and line marking

Driveways, yards and car parks dug out, built up on proper stone and surfaced in two layers, then marked out in bays, arrows and disabled spaces that last.

in short

AltHome lays tarmac driveways, yards and car parks across Kerry, Cork and Limerick: dug out, a geotextile membrane, compacted stone, edgings and drainage, then two layers of tarmac, a binder course and a wearing course. Car parks are then marked out in bays and arrows. A house drive to a small yard takes two to five days, and you can park on it after 48 hours.

2 layersBinder course then wearing course, never one
2 to 5 daysHouse drive to a small commercial yard
48 hoursBefore you park a car on it
Kerry · Cork · LimerickWhere the crew works

what decides it

It is the base and the fall, not the black stuff on top

Tarmac does not carry the car. The stone under it carries the car, and tarmac is the waterproof jacket over the top. So the job starts with a dig out, not with a delivery. The topsoil and any soft ground come out, a geotextile membrane goes down so the stone and the subsoil never mix, and then compacted hardcore goes in, usually around 150 mm on a house drive and more where vans and deliveries will turn. Skip the membrane and the stone slowly sinks into the ground over three winters and the surface dips where the wheels sit. The next thing that decides everything is the fall. Water has to run away from the house and into a gully or a drainage channel, never towards the door and never into the neighbour’s garden. On a drive that slopes down to the house we put a channel drain across the entrance and connect it properly, because in a heavy October downpour a drive is a river. Since 2010 a new or replacement front drive that drains onto the public road is also a planning issue, so we either fall it to a soakaway on your own ground or use a permeable build up. It is worth getting right, it is not expensive at the start and it is very expensive to undo. Then the surface itself: a binder course of coarser material laid and rolled hot, and a finer wearing course over it, two layers, joined at the edges against a hard kerb or edging so nothing crumbles away. A single thin layer laid straight onto old cracked concrete looks perfect for a year and then telegraphs every crack underneath it. And we do not lay in frost or heavy rain, because tarmac that cools before it is rolled never reaches density and will ravel out in stones by the second winter.

Marking out a yard or a car park

Lines are set out to a plan, not by eye: standard bays about 2.5 by 5 metres, wider accessible bays with hatching to the side and the wheelchair symbol, arrows, give way markings and hatched fire routes where they are needed. The surface has to be fully cured before marking, so a new car park is marked a couple of weeks after it is laid. We use a hard wearing road paint on smaller jobs and thermoplastic where the traffic justifies it, which is melted onto the surface and lasts years rather than a season. Remarking an existing car park is usually a weekend job, and it does more for how a business looks than most things costing the same money.

the work

What is included in a tarmac driveway?

  • Dig out to depth, cart away the spoil and take out any soft spots we find.
  • Lay the membrane, fill with hardcore and compact it in layers to the finished levels.
  • Set the edgings, kerbs and channel drains, and connect the drainage to a gully or soakaway.
  • Lay and roll the binder course, then the wearing course, hot and to the right falls.
  • Seal the edges and the joints against the house, the kerb and any manhole covers.
  • Set out and paint the bays, arrows, accessible spaces and hatching once the surface has cured.

4 steps

How long does it take to lay a tarmac driveway?

You get in touch

Send the address and rough measurements, or the number of bays you need. We answer the same day.

We come and look

We check what is under the existing surface, where the water goes and how a lorry gets in. Then a written price with the build up depths on it.

We lay it

Dig out, stone, edgings, drainage, two layers of tarmac. You keep access to the house each evening.

You sign it off

We come back to mark the lines once it has cured, wash down and leave the guarantee in writing.

asked

Tarmac and line marking: common questions

Can you lay over the old drive?

Sometimes, if the existing base is sound concrete or old tarmac with no movement and the extra height does not block a door or a gully. If it is cracked, lifting or sitting on soft ground, an overlay just copies the problem upwards. We will tell you which one you have before you pay for either.

How soon can I drive on it?

Walk on it the same evening, park a car after about two days, and keep heavy vans and trailers off it for a couple of weeks while it hardens fully. In warm weather leave something under a motorbike stand or a caravan jockey wheel for the first month.

Do I need permission for a new driveway?

You do if you are creating a new entrance onto a public road, and there are rules about surface water running off a front drive onto the road. Resurfacing an existing drive that drains onto your own ground is normally fine. We look at the entrance and the fall on the first visit.

How much does a tarmac driveway cost in Ireland?

Area, how much digging and stone the ground needs, edgings, drainage and access for the machines set the price. Laying over an old drive is cheaper only when the existing base is sound. We measure and give a written price.

Tarmac or concrete for a driveway?

Tarmac is quicker to lay, can be used within two days and is easier to patch. Concrete lasts longer with less upkeep but takes a week before you drive on it. Both depend on the stone base more than the surface.

quote

Get a fixed quote for a tarmac driveway

Tell us the address and the approximate area in square metres. We work across Kerry, Cork and Limerick. We ring you back within one working day. Photos of the entrance and the existing surface make the price tighter.

085 220 1422 · info@althome.ie

Written by the AltHome crew. Last reviewed September 2026.