Mobile and modular homes
A second home in the garden for a parent, a grown child or a tenant. Built in sections off site, set on a base we pour, connected to real services and finished to live in all year.
in short
AltHome supplies, sites and finishes mobile and modular homes across Kerry, Cork and Limerick: the base poured, the unit delivered and set, and water, power and drainage connected properly so it can be lived in all year. Allow 8 to 14 weeks from order to moving in, with two to four days on site once the base has cured. Planning is the first question to settle.
read this first
The planning question, answered honestly
People are told all sorts of things in the pub about parking a unit in the garden and living in it. Some of it was true once, most of it was never true, and councils in Kerry, Cork and Limerick do not all read the rules the same way. Here is the shape of it. Putting a structure in your garden and using it as a separate dwelling is development, and development normally needs permission. A garden room used as part of your own house, a home office, a gym, a room for a teenager who eats in the main house, is a different thing and can fall under the exemptions for domestic structures, which cap the floor area, the height and how much garden is left behind. The moment it gets its own kitchen, its own front door and someone sleeping there permanently, it starts to look like a dwelling to a planner, whatever it says on the invoice. There are routes that work. Permission for a granny flat or annex tied to the main house is granted regularly where there is a genuine family need, a sensible site and a proper wastewater arrangement. Some councils are open to converting an existing outbuilding, which can be a faster path than a new structure. What we will not do is tell you it is grand and let you spend a fortune on something you may have to take away again. We look at the site, tell you which of the three routes you are on, and where it is close, we send you to pre planning with the drawings rather than guessing for you. Two other things get overlooked. Your existing wastewater system has a design capacity in persons, and adding a household to it may mean upgrading it. And a unit sited near a boundary has to be far enough from it for fire spread, which quietly decides where in the garden it can actually go.
Modular, or an extension?
If the space has to be joined to the house and used every day, an extension is usually the better investment and adds more to the value of the property. A modular unit wins when the site is awkward, when you want the people living in it to have their own front door, or when you need it finished in half the time and with almost nothing happening inside your house while it is built.
the work
What is included in a modular home?
- Check the site, the access for the lorry and the crane, and the route the unit has to travel.
- Sort the planning route with you before anything is ordered.
- Dig and pour a level base or set screw piles, and run the drains, water and power to it.
- Set the unit, join the sections, weather the joints and finish the roof.
- Connect water, waste, power and heating, and test everything before you move a stick of furniture.
- Clad or render outside, lay a path to the door, tidy the garden and take the waste with us.
4 steps
How long does it take to install a modular home?
You get in touch
Tell us who it is for and send a photo of the garden. We answer the same day.
We come and look
Access, ground, drains, boundaries and the planning route, then a written price for the unit and everything around it.
We build and set it
The base is poured while the unit is being built. Delivery day is noisy and short, and the garden takes the mess, not the house.
You sign it off
Services tested, certificates handed over, site cleared, guarantee in writing.
next door
The other ways to get the same room
Before you order a unit, price these three against it. One of them is often cheaper and easier to get through planning.
asked
Mobile and modular homes: common questions
Can my mother live in it full time?
That is the question to settle before anything else, because it decides whether you need permission. Family annexes are granted often enough, but they are granted, not assumed. We look at the site, tell you what we think the council will say, and put you in front of them early if it is at all borderline.
Is it warm enough for an Irish winter?
A properly built modular unit is insulated, airtight and heated like any small house, usually with an electric heat pump or panel heating. A second hand caravan is not, and no amount of cladding will make it so. If someone is going to live there year round, buy the specification, not the photograph.
Will the lorry and crane get in?
That is the first thing we check, and occasionally it is the thing that kills the idea. Narrow entrances, overhead ESB lines, soft ground and tight corners all matter. Where access is impossible we can build the same room in place instead, and we will say so at the survey rather than on delivery day.
Do I need planning permission for a modular home in the garden?
A unit used as a separate home, with its own kitchen and someone living there permanently, normally needs planning permission. A garden room used as part of the main house can fall under the exemptions. Councils read this differently, so settle it before you order.
How much does a modular home cost to install?
The price is the unit plus the base, the service connections (water, sewer or treatment, power) and the finishes around it. Long service runs and difficult crane access add the most. We price all of it together on a plan so nothing is left out.
quote
Get a fixed quote for a modular home
Tell us the address and who the room is for. We work across Kerry, Cork and Limerick. We ring you back within one working day. Add photos of the garden and the entrance and the price we send you will be tighter.